P&D grant
application submitted – FY15 budget process continues
Circulation
January circulation activity was 4,721, which is 18.0% higher than last month, but still a decline from last year (14.2% lower). Ebook downloads reached a new high of 288 titles downloaded this month. The previous high was 253 from October of 2013.
January circulation activity was 4,721, which is 18.0% higher than last month, but still a decline from last year (14.2% lower). Ebook downloads reached a new high of 288 titles downloaded this month. The previous high was 253 from October of 2013.
Laptops: 7. Nooks: 3. Games: 55.
Unique Patrons
Upton Library currently has 1,919 items checked out to 425
unique patrons.
Digital Content Use
BYKI: In January, 4
users accessed byki for a total of 2.1 hours.
Our top languages were German and Spanish.
Overdrive: eBook
circulation to Upton
patrons: 288, eAudio circulations: 74.
Wowbrary: We have 138 active subscribers to Wowbrary. (-2)
New Patron Registrations: 15 new patrons registered in January.
New Items: We
added 272 items to the collection in January.
Passport Applications
processed in January: 7.
Programs
Library book group: 5 people met on Jan 29th.
Senior book group: met on January 14th.
Library book group: 5 people met on Jan 29th.
Senior book group: met on January 14th.
Thursday storytime
averaged 5 children per session for 5 sessions.
TinyTots lapsit averaged 2 children per session for 3 sessions.
Library Table: 4 visits, averaged 7 patrons and 27 items.
TinyTots lapsit averaged 2 children per session for 3 sessions.
Library Table: 4 visits, averaged 7 patrons and 27 items.
Lego Days: averaged
5 children for 3 sessions.
Plans for Next Month
1) FY 15 budget and personnel decisions
2) Improvement project – bids, scheduling and move out
1) FY 15 budget and personnel decisions
2) Improvement project – bids, scheduling and move out
3) Collection development
Library Improvements
The specifications
for the library improvements project have been completed, and the project has
been advertised as required in the Central Register and local newspapers.
A public walkthrough
of the building was held on Jan 28th, and representatives from four
general contractors were present.
Bids are due on Feb
5th at 11am. After the bid
opening, the Trustees have a scheduled meeting on Feb 6th 7pm to
discuss the qualifications of the firms and the bid amounts.
Improvements Schedule
Assuming we are able
to award a contract early in February, I am preparing for the move out and the
work to be completed. The current plans
are:
Feb 17th-20th
– shipping boxes and storage trailers delivered. Two 40’ and one 20’ trailers will be located
on the Thompson family land across Grove
St. from the library. Rental and delivery cost: $2,070. Library materials will be packed into ~650
boxes. Box and packing supplies cost:
$1,000. Packing will be performed by
library staff.
Feb 24th – Limited library services begin.
Reference services and interlibrary loans will be offered from the Fay
room on the 2nd floor of Knowlton Risteen building. I recommend a reduced schedule of Tues, Thurs
and Saturday, and closing on Wed and Fri.
Feb 24th-28th
– Library materials packed and moved into trailers. Packing will be done by library staff, moving
by the Worcester County Sheriff’s work release program.
Mar 3rd-21st
– Library space is turned over to the general contractor for work to be
completed.
Mar 24th-28th
– Library materials moved back into the building.
Mar 29th – Regular library services resume
Mar 31st –
Trailers removed.
Planning and Design Grant
The planning and
design grant application was completed, signed and submitted. I have received an email verification that
the application was received by the MBLC.
I don’t expect to hear anything else from the MBLC until they announce the
provisional grant awards on June 5th, 2014.
In the final
submission, our budget request was increased to $66,000 to ensure adequate
funds for the owner’s project manager.
This means the town’s matching appropriation will be $22,000.
Our next steps are
to start assembling the feasibility committee, and to present 3 articles at the
annual town meeting (2 for approvals, and 1 financial appropriation).
FY15 Budget
Budget request was
submitted to the Finance Committee with 2.5% wage increases for current library
staff.
I will be attending
Personnel board meeting and Finance Committee meetings on Feb 5th to
receive and provide more information about the FY15 library budget.